Résumé de section

  • In line with the "FIT for Purpose" Approach, the post-treatment line has been designed and realized for the reclamation of the secondary treated wastewater from the WWTP Ramtha and accumulated in an existing storage pool. 

    The line is composed of a filtration treatment through pressure sand and disc filters, followed by a subsequent disinfection stage by means of the action of ultraviolet radiation and maintenance chlorination (chlorination labyrinth). One piping chamber has been installed at the outlet of the existing storage tank to laminate possible variations in the effluent flow of the WWTP and, on the other, to allows water with a more constant quality to be introduced into the reclamation treatment train. A pressure group has also been installed to achieve the pressures required by the filtering systems.